Touchplan Blog

Filter by Category
Filter by Category

Granger Case Study

DSC01247edit

Read our case study on Granger Construction, a general contractor based in Lansing, Michigan, that undertook a $3.1 million project to substantially renovate the 5 Foster Pediatric Unit of Sparrow Hospital. Working against a hard deadline in a high-stakes environment, the team finished six weeks ahead of schedule to reopen the pediatrics unit sooner with cost savings that enabled upgrades to the original project scope.

Download Case Study

 

 

 

Happy Thanksgiving from Touchplan
Touchplan Is at Groundbreak 2018!

About Author

Katherine Van Adzin
Katherine Van Adzin

Have an idea for the blog? Get in touch at marketing (at) touchplan (dot) io.

Related Posts
Vital Actions Every Construction Project Needs to Take to Tackle COVID-19 Now
Vital Actions Every Construction Project Needs to Take to Tackle COVID-19 Now
How Project Teams Can Adapt During COVID-19
How Project Teams Can Adapt During COVID-19
What to Look for in ConTech in 2020
What to Look for in ConTech in 2020

Subscribe To Blog

Subscribe to Email Updates