
About this Touchplan Project
General Contractor: Suffolk Construction
Type: Residential
Square Feet: 3,000,000
Project Summary
1 Horizon Way, Everett, MA
Encore Boston Harbor is a 34-acre, 3-million-square-foot, five-star casino opening June 2019 along the Mystic River in Everett. Encore Boston Harbor will feature a 210,000 square foot gaming facility with approximately 3,200 slot machines and 160 gaming tables. A 24-story, 350-foot tall curved glass tower will contain over 600 luxury hotel rooms with a standard room size of over 600 square feet.
A 24/7 public waterfront park, including a boat dock, with sweeping views of the Boston skyline will be constructed along the Mystic River. Encore Boston Harbor will also include retail and restaurant space as well as a spa and health club. A three-level underground garage will be built on site with parking for approximately 3,000 cars.