About this Touchplan Project

General Contractor:  Tocci Building Corporation

Type: Residential and Retail

Square Feet: 141,000

Project Summary

32 Cambridge Street, Charlestown, Boston, MA

Upcoming renovation of the existing Graphic Arts Building located in Sullivan Square steps to the MBTA Orange Line, and construction of a new four-story modular building on site. A total of approximately 171 residential apartments will be built at 32 Cambridge Street, including 46 apartments in the Graphic Arts Building and 125 in the new-construction building. Residential apartments at The Graphic will include studios, one-bedrooms, two-bedrooms and three-bedrooms.

Approximately 5,000 square feet of retail space will be located on The Graphic’s ground floor. A 97-space parking garage will be built underneath the new-construction building; a total of 113 parking spaces will be located on site. A pre-existing building fronting Rutherford Avenue has been demolished to make way for the new building.