You are here:

About this Touchplan Project

General Contractor: Pilot Construction

Type: Residential

Project Summary

12 Valley Street, Everett, MA

Four-story building completed in 2015 featuring 190 1- and 2-bedroom luxury apartment residences. Residences feature state-of-the-art finishes including quartz countertops, stainless steel appliances and wood and ceramic tile floors. Amenities at Wellington Parkside include a business center, a clubhouse, a fitness center and a yoga studio.

144 covered parking spaces, in addition to surface parking, are located on site, as are bicycle storage facilities. Wellington Parkside is located minutes to the Wellington MBTA Orange Line rapid transit station and adjacent to the Northern Strand Community Trail. Downtown Boston and the future Wynn Boston Harbor casino are a short drive away.